Week 6 Construction Update
An engineer issued the foundation certification, and the surveyor completed the foundation survey. A concrete truck arrived and pumped in the foundation walls. Pre-work for plumbing is complete. The builder took the first draw, representing 11.58% of the budget. Next up, the city should inspect the foundation, and then the dirt around the foundation can be backfilled.