Week 35 Construction Update
Since the prior week 27 construction update, several items have been completed. The plumbing, electrical, gas, and HVAC rough ins are done. The roof membrane and roof tiles have been installed. The walls have been insulated with spray foam. And finally, dry wall is mostly complete.